Maintenance planning 2025
AGGM also handled the cross-system maintenance coordination for 2025 in accordance with its role as market and distribution area manager as defined in the Natural Gas Act. (Section 11 para 14 and Section 27 para 18 GWG 2011).
The measures reported by the distribution network operator, transmission network operator and storage system operators are checked by us for overlaps and, if necessary, combined or unbundled so that there are no interruptions to supply.
A transparent and communicative exchange of information between all parties involved is important to us.
We have prepared the results of this exchange and maintenance coordination for you in the current Integrated Annual Maintenance Plan 2025 (IAMP) and published it on our website.
https://www.aggm.at/en/gasgrid/maintenance/
The first page of the Integrated Annual Maintenance Plan contains the planned maintenance measures of the transmission system operators with all relevant entry and exit capacities at the respective border crossings. On the second page you will find the restrictions of the storage system operators at the entry and exit points.
If you are interested, you can access our archive of publications via the following link.
https://www.aggm.at/en/downloads/reports/
|
 |
 |
 |